It was a large server UPS.



Board fried out in it. It had four battery modules (each with 5 or 6 small Pb batts), but my guy kept two of them because they tested out fine.

He is the IT Admin for a hospital, and I was pretty d@mn glad he is a former USMC still in fighting form, because that mutha was HEAVY. The transformer was about 80lbs.....it had a plaster(maybe) core that came out easily enough when the copper started coming out. Didn't have the toughness or mass of epoxy for sure.