It was raining, cold, and high winds yesterday morning so it was tax time. The rain stopped around noon so I traveled the 30 miles to survey the project. Took hand tools but not the trailer or skid steer. This is what was completed in four hours including travel time. First the flanges on the pivot point were unbolted using a cordless impact wrench. Then the pivot point was dragged into the field and leveled to the ground. (Turtle theory used on the water tank project.) Then one by one each tower was dropped.
![]()