There was a lot that got cut but total time 1.5 hours. I did see one other guy out that I had never seen before he was coming out of an area that I would have gone into but when I saw him I just bypassed that area. Normally I see 2 or 3 guys out but it had rained earlier and was at times looking like more but never did. Got to love those fair weather guys. Lol
Thanks for the video likes.
Load Estimate:
Steel 250lbs @.09 = 22.50
Brass from stove 3lbs @1.70 = 2.80
Copper 20lbs @2.80 = 56.00 once stripped
Elec motors 2lbs @0.25 = 0.50
Alum 4lbs @0.45 = 1.80
Total $85.90
Bookmarks