Originally Posted by
IronShredder
Funny you mention Cable Management. I spoke to them about their system a few weeks ago. They sent me a quote for $531,454 for that ACR setup. There's no way I can 1) afford that, and 2) ever see a return on that investment. The system I purchased has all the same components (single shaft, mag belt,
granulator, air separation, cyclone dust system, control panel, conveyors) so I'm hoping for the same results. I don't know if I mentioned but I also purchased a Wiema Single shaft shredder to pre-shred the bales before entering into the smaller shredder which was included with my system. That way I don't have to pay someone break up the bales. I wish I knew how to post pics on here. I'd sent some pics to show you guys.
I believe they have customers running acr with a C1 setup. Those are in the 50k range. Would probably add a single shaft shredder with a conveyor and mag belt. That would probably put you in the low 100s