Results 1 to 20 of 22

I'd Hate to be Them.

| Off Topic Discussions

Threaded View

  1. #16
    SMF Badges of Honor

    Member since
    May 2011
    Location
    Saint Louis, MO
    Posts
    762
    Thanks
    15
    Thanked 900 Times in 349 Posts
    This story is crazy. This copper is Number 2 tin plated by the way. These locomotives had to be in storage for an extended period of time. I am not going to share how much copper is in that SD40-2 but its more then a ton. The copper is over 1 and 1/2 inches thick and very hard to maneuver around. There are also wire ways that hold the wire in every foot with two bolts and multiple pieces of plastic. Some runs have 8 wires some have 4. I want to know how long it took them to do it. We usually turn the bases and strip them with the grapple. Doing it by hand would take days and days to do. They had to have help. We are a scrap yard and have all the tools available to break them down as fast as possible and I know how hard it would be to do this. Its just boggles my mind that they did 22 of them. 5.5 mill is a low low number to get these locomotives fixed. I think they are just talking about replacing the wire and not labor and time lost.


  2. The Following 7 Users say Thank You for This Post by PistoneScrapProcessing:


Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

 
Browse the Most Recent Threads
On SMF In THIS CATEGORY.





OR

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

The Scrap Metal Forum

    The Scrap Metal Forum is the #1 scrap metal recycling community in the world. Here we talk about the scrap metal business, making money, where we connect with other scrappers, scrap yards and more.

SMF on Facebook and Twitter

Twitter Facebook