You need to charge a fee for demo and haul bill to landfill. Best method would be to strip all you can and want to and then have a trackhoe come in and do final demo, load in dump truck and haul off. You should be left with the frame to cut up with a torch. Tour travelling distance does provide a kink to work out.
Bookmarks