hmmm never thought of that. what I was doing is to see just how much I could maximise time when scrap is plentifull. I probably saved 1 hr by cutting the bonnets off rather then punching out the copper, figgure I woud put those aside and punch them in leaner times. I have a guy now bringing me 10-20 compressors 2-3 times a week.