Quote Originally Posted by Dbone View Post
How long must I wait before I can post links?


I
'm impressed with this forum and its members. I've ran across both types of transformers in my first 2 lights so far and it didn't take too long to take apart. I'm positive I can get even faster, so that's no problem. I'm now trying to imagine how much space I will need to achieve this task. I have a 20'x20' garage but that will fill up quickly I imagine. What are some tips you guys use to stay organized and proficient? Here are 2 more pics of some progress. Just close the spaces in the links.

photos. app. goo. gl/ qedNi7i6Ap97YVPm6
photos. app. goo. gl/ D1vprmkuwmJ4RzQH8

Aw man you can do all 300 out of a 20x20 garage! (Maybe lol)

Everyone has their own "system" I have essentially 2 piles in my garage, one, along the back wall that is my "queue"... This is basically my dumping ground. And then I have a gaylord sized box (was actually a couch box... but its huge and sturdy) that is my "shred"/"light iron" place.



So if I was you I would stack as many as I could, up to the ceiling in the back, then work on taking them apart as you have time. All the screws and breakage and stuff that is magnetic metal goes in the shred pile towards the front of the garage, and then everything else that is its own category of thing goes into their own bins. When the bins fill up, I take em to the yard to cash in. Then start over.