Well basicly we have as much time as we can get. We are going to sleep in the truck and tear down throughout the day. I've done demo before but not an entire house. One way or another they are going to knock it down. I figured by the time we pull the easy stuff like appliances, light fixtures and all that stuff we have covered fuel. We would leave after school on Friday and then work the night pulling drywall, and pull all the looses stuff Saturday morning. And I mean we can take everything down to the nails that hold it together if we wanted to. It really is about the experience. I know what it would take me to process the stuff, but getting it out is my concern.