    How many computer towers can you break down in a 10 hr day

    Im curious if you had a un limited supply of just towers how many could you dismantle and separating the parts coming back to the hard drives and dvd and power-supplies later



  2. #2
    SMF Badges of Honor


    Member since
    Jul 2012
    Posts
    265
    Thanks
    31
    Thanked 186 Times in 87 Posts
    how long does it take you to do one?

    there isn't much to it, take off the sides, undo maybe 15 screws, pull a few wires and it's done.
    so 5 minutes each maybe, 12 an hour, 120 a day.

    i'll say 120

  3. The Following User Says Thank You to scrapperben for This Post:


  4. #3
    PartTimeScrapper's Avatar
    SMF Badges of Honor



    Member since
    Aug 2011
    Location
    Morrison, Colorado
    Posts
    3,400
    Thanks
    1,004
    Thanked 3,256 Times in 1,335 Posts
    Well that all depends. are they all the same type like dell clam shells? I can break a dell clam shell down in less than 4 minutes and if you start doing the same type you only get faster as you go. On average I think I can usualy break down any tower in about 5 minutes. Now the older 486 towers are another story. Some of the old HP towers can be a bear as well. So personaly I would say 12 to 15 an hour would be a real good pace for me.

  5. The Following User Says Thank You to PartTimeScrapper for This Post:


  6. #4
    HLH&R Metals Recycling's Avatar
    SMF Badges of Honor

    Member since
    Jul 2011
    Location
    Waxahachie, Tx
    Posts
    56
    Thanks
    5
    Thanked 98 Times in 32 Posts
    I generally use 6 minutes per tower as a production rule for my breakdown guys. Having the right tools easily available, plus bins to sort the material into, helps significantly.
    HLH&R Metals Recycling
    www.elliscountyscrapmetal.com
    972-617-4547
    Facebook
    Twitter: @hlhrmetals

  7. The Following User Says Thank You to HLH&R Metals Recycling for This Post:


  8. #5
    mikeinreco's Avatar
    SMF Badges of Honor


    Member since
    Dec 2011
    Location
    TENNESSEE
    Posts
    4,973
    Thanks
    1,257
    Thanked 5,023 Times in 2,350 Posts
    My limit per day is around 50 and that is pushing it......The other day I did 40 but they were missing alot of parts..........Anyway there are only so many I can do in a day until I get extremely bored or tired with them and have to do something else

  9. #6
    camdaddy started this thread.
    SMF Badges of Honor


    Member since
    Jul 2012
    Location
    North Carolina
    Posts
    43
    Thanks
    45
    Thanked 7 Times in 6 Posts
    Quote Originally Posted by scrapperben View Post
    how long does it take you to do one?

    There isn't much to it, take off the sides, undo maybe 15 screws, pull a few wires and it's done.
    So 5 minutes each maybe, 12 an hour, 120 a day.

    I'll say 120
    i can do around 110-115 doesn't matter what kind they are just wanted to see where how i compare to others i think we are all about the same on time frame thanks for your reply

  10. #7
    SMF Badges of Honor


    Member since
    May 2012
    Location
    SC - NC State Line
    Posts
    220
    Thanks
    50
    Thanked 120 Times in 76 Posts
    ok well, for my very, small time operation, just the thought of unlimited towers to break down , gives me goose bumps. Lol.

    As for the hypothetical (sp) question.

    Ok for starters i break the whole tower down further than I see some people describe as their normal way of doing it. However, as I understand it, you said to leave out all of the extra things and just take the motherboard, ram, cpu (including fan and heatsink if present and possibly taking metal off of rambus), and pulling the wires and finger cards.

    Just to take those items plus the cover ofcourse and I assume leaving the power supply wires on it. I could probably work my way to 8 to 10 minutes each with just ordinary hand tools. And with one little upgrade (power drill with full set of the 6" security bits) I could probably get good enough to do it all in 5 minutes, maybe 4 minutes if they were all the same. Those times would probably just be the initial removal from the tower it's self. If you are adding sorting those parts also, I would have to add more time, because i break down a few of those a little bit more even after I pull them. What can I say other than I am just slow, ha ha.

    Yeah an unlimited supply of just complete towers just two days a week would make me VERY happy.

  11. #8
    Ecycle Atlanta's Avatar
    SMF Badges of Honor

    Member since
    Apr 2011
    Location
    Outside Atlanta
    Posts
    734
    Thanks
    291
    Thanked 692 Times in 326 Posts
    Quote Originally Posted by mikeinreco View Post
    My limit per day is around 50 and that is pushing it......The other day I did 40 but they were missing alot of parts..........Anyway there are only so many I can do in a day until I get extremely bored or tired with them and have to do something else
    and dont forget all the breaks for coffee, cigs and angry birds! (in my case it diet coke, choc chip granola bars and temple run :P)

  12. #9
    SMF Badges of Honor


    Member since
    Jul 2012
    Posts
    265
    Thanks
    31
    Thanked 186 Times in 87 Posts
    as the days pass though, I think you'd start to get rsi or something by repeating the same movements over and over.
    definitely would need different things to do in between.

    personally I wouldn't do any more then 10 in any given day, if I had to do 120 a day I think i'd be doing something else.
    I like to savour the moment, removing the motherboard, the big heat sink and fan, hoping it's a nice one with pipes coming out or a chunk of copper in it, cleaning it up, looking at it, even hard drives I like to look at, read the size, the year and basically just holding them in my hand, I feel kinda powerful.
    the cd drives I open up at the time too, a quick board removal procedure and it's done.
    I also clean up the cards of those steel plates, remove the casing from the power supply and cut the ends off ribbon cables.
    so this all takes me maybe 30 minutes or so, glad I don't have rent to pay.

  13. The Following User Says Thank You to scrapperben for This Post:


  14. #10
    SMF Badges of Honor

    Member since
    Oct 2012
    Location
    Alabama
    Posts
    764
    Thanks
    1,067
    Thanked 1,213 Times in 471 Posts
    If I have several to take down, I sort them into like kinds first. The standard Gateway, Compaq, HP, etc that have all Phillips screws, I can average 3 minutes. Dell clamshells like Optiplex have mostly slide locks or levers and if I am on my game I can get those in 2 1/2 minutes. The ones that have #15 Torx take me 4 minutes because I don't have a bit and have to go manual. The old ones like 486 IBM machines take a little longer because I have to check each time to see what tools I need and how everything comes apart. Same thing for smaller Emachines. Older Apple....GRRRRR. Some are a beast and take forever, over ten minutes, but they do reward me with a nice ceramic Motorola chip. Those iMac all in ones and IBM dumb terminals almost 30 minutes. I'd say if I were going to sort them and do the easy ones first, I could get close to 20 per hour for a little while. No way I could hold that pace for long though and you won't get all easy ones. Actual numbers, the most I've done in one streak is 33 and it took just over two hours.

  15. #11
    SMF Badges of Honor


    Member since
    Oct 2012
    Posts
    74
    Thanks
    16
    Thanked 29 Times in 15 Posts
    Wake up at 5AM. Drink a pot of coffee. They seem to take themselves apart

  16. #12
    GeorgeB's Avatar
    SMF Badges of Honor

    Member since
    Sep 2011
    Location
    Manassas Park, VA
    Posts
    2,919
    Thanks
    462
    Thanked 639 Times in 432 Posts
    Like everyone else has said, it all depeneds on the make and model. Some are 2 to 3 minutes, while others can take 10 or more minutes. But I can generally do 10 to 15. If I average out the number of all the ones I have done so far.
    George Beale - Founder & President - info@viprecyclingjunkremoval.com
    VIP Recycling Junk Removal LLC - Premier Scrap Metal, Junk, & Electronic Recyclers!
    http://www.viprecyclingjunkremoval.com

  17. #13
    Russell's Avatar
    SMF Badges of Honor

    Member since
    Jan 2012
    Location
    Chicago,Il
    Posts
    815
    Thanks
    495
    Thanked 707 Times in 324 Posts
    Besides breakdown time also consider the time it takes to A. Pick them up. B. Carry them to your workstation.C. reload the shells for scrap. D. Package up the boards/parts for selling.E. fuel/ shipping costs.

    Perhaps another title headline reading how to keep good books would be more appropriate. Unless everyone enjoys fooling themselves...

  18. #14
    SMF Badges of Honor


    Member since
    Nov 2010
    Location
    Boise, ID
    Posts
    2,702
    Thanks
    2,237
    Thanked 2,352 Times in 1,014 Posts
    Haven't timed myself but I'd say I can do one in 3 to 6 minutes.

    Btw, on some of those heat sinks with the copper tubes coming out, the bottom is a copper plate. It may look aluminum but scratch it to see. I use a torch to heat it up and pop it out. Also have used an air chisel.

  19. #15
    Ecycle Atlanta's Avatar
    SMF Badges of Honor

    Member since
    Apr 2011
    Location
    Outside Atlanta
    Posts
    734
    Thanks
    291
    Thanked 692 Times in 326 Posts
    Quote Originally Posted by Russell View Post
    Besides breakdown time also consider the time it takes to A. Pick them up. B. Carry them to your workstation.C. reload the shells for scrap. D. Package up the boards/parts for selling.E. fuel/ shipping costs.

    Perhaps another title headline reading how to keep good books would be more appropriate. Unless everyone enjoys fooling themselves...
    VERY good point. I'm in the process of picking through a 1/3 full gaylord of PCB's of all types that i bought this morning. Calculating all time & expenses to see how it all works out. Volume is the best ally i have right now.

  20. #16
    SMF Badges of Honor

    Member since
    Nov 2011
    Posts
    4
    Thanks
    0
    Thanked 0 Times in 0 Posts
    I've done 83 complete towers into their appropriate boxes, picked clean, fingers trimmed and packed down to ship in 6.5 hours....minus the tower cases, I call a heavy metal scrapper friend to get those

  21. #17
    47service's Avatar
    SMF Badges of Honor


    Member since
    Oct 2012
    Location
    allentown
    Posts
    13
    Thanks
    0
    Thanked 2 Times in 2 Posts

    Time

    I have timed myself on a few occasion. To get a base line for my employee. My best time was on a dell witch only need 4 screws removed. It was less than 40 seconds on average. I did 10 in just over 7 minutes.
    On the other side. Some of the older computers are a real pain and can take upwards of 10 minutes each. If i am calculating labor. I figure between 6-9 minutes each minimum. As i may have taken them apart in 40sec but i had a large pile of empty towers. And crates of boards that need to be replaced with new empty ones.

  22. #18
    SMF Badges of Honor

    Member since
    Mar 2012
    Location
    Chesaning
    Posts
    472
    Thanks
    24
    Thanked 355 Times in 171 Posts
    My employees can do 350 per 8 hour pay.

  23. #19
    SMF Badges of Honor

    Member since
    Feb 2012
    Location
    coast of nc
    Posts
    110
    Thanks
    261
    Thanked 132 Times in 53 Posts
    i guess i spend a little more time than most people, but i usually take 20-30 min per tower. that includes the time to break down hard drives(i know),the power supplies(i have more time than $$),cut ends off cords,clean heat sinks,and sort.I am gonna get called crazy for this, but i also put them back together(after filling them with random bits of shred) to make them easier to stack and load.

  24. #20
    mikeinreco's Avatar
    SMF Badges of Honor


    Member since
    Dec 2011
    Location
    TENNESSEE
    Posts
    4,973
    Thanks
    1,257
    Thanked 5,023 Times in 2,350 Posts
    Quote Originally Posted by ResourcefulRecycling View Post
    My employees can do 350 per 8 hour pay.
    Can you provide them with that many day after day??????


  25. Similar threads on the Scrap Metal Forum

    1. 82 Computer Towers Last Couple of Days
      By RecyclingSecrets in forum A Day in the Life of a Scrapper
      Replies: 23
      Last Post: 12-14-2012, 06:55 PM
    2. how much are computer towers worth in scrap?
      By mrvictor1 in forum A Day in the Life of a Scrapper
      Replies: 27
      Last Post: 06-17-2012, 10:49 PM
    3. Computer Towers
      By deputy in forum Scrap Metal Questions and Answers
      Replies: 11
      Last Post: 12-14-2011, 09:52 PM
    4. xmas lights to computer towers
      By rca987 in forum A Day in the Life of a Scrapper
      Replies: 9
      Last Post: 09-12-2011, 09:09 PM
    5. computer towers
      By nikaoman in forum Scrap Metal Questions and Answers
      Replies: 7
      Last Post: 07-24-2011, 01:28 PM

Page 1 of 2 12 LastLast

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

 
Browse the Most Recent Threads
On SMF In THIS CATEGORY.





OR

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  

The Scrap Metal Forum

    The Scrap Metal Forum is the #1 scrap metal recycling community in the world. Here we talk about the scrap metal business, making money, where we connect with other scrappers, scrap yards and more.

SMF on Facebook and Twitter

Twitter Facebook