Today was a much better day
Today was much better. First and foremost my stress level has gone down. After speaking with family about the water situation and the slow progress I was offered compensation for working on the water service. This turns out to be a win for everyone involved.
The foundation tenants get water service (Including us) and we get some breathing room to finish the trailers plus the foundation gets a better rate for the plumbing bill than if an outside contractor was hired for the work. A big relief all the way around.
Tonight the pipes will set and tomorrow we'll be able to test the lines.
Also depending on the weather we will get the bigger trailer and take a load to the scrap yard. I'm taking advice from the forum and loading anything metal that's not bolted down. I know of a couple water heaters, 3 bath tubs and the metal that's been staged so far. I'm encouraged at the thought of getting some cash in hand for the first time since beginning.
Today's work
http://i258.photobucket.com/albums/h...n/DSCN6259.jpg
Getting to the bad pipe
http://i258.photobucket.com/albums/h...n/DSCN6266.jpg
The replacement
http://i258.photobucket.com/albums/h...n/DSCN6276.jpg
We are hoping this takes care of it
http://i258.photobucket.com/albums/h...n/DSCN6280.jpg
At least we have water at the pump house so we can fill containers to get by.